
Arizona Basketball Courts
Half-court, full-court and driveway builds across Greater Phoenix — poured to spec, hooped at regulation height, and finished in tournament-grade Laykold that stays cooler underfoot in July.
A preliminary range in about a minute. No obligation, no sales call required.
Basketball court services across Greater Phoenix
Four ways we work on basketball courts, depending on what is sitting in your yard today.
- Basketball court construction: From bare ground — grading, a reinforced slab, hoop footing cast in the pour, then Laykold color and markings.
- Basketball court conversion: An unused tennis court, RV pad or patio slab becomes a half-court, pole footed alongside.
- Basketball court resurfacing: Crack repair, fresh build coats, and new keys, arcs and lane lines at the spacing you play.
- Basketball court cleaning: Pressure washing on a one-time or recurring plan, before dust dulls the grip underfoot.

Sizing a basketball court to your lot
Very few Phoenix backyards take a regulation full court, and that is no loss. The half-court is where the game actually gets played.
Half-court
30' x 50' minimumFits the majority of residential lots. Carries a full key, a full arc and a genuine top-of-the-key jumper. Thirty-five by sixty is the comfortable version if the yard allows.
Full court, high school
50' x 84'Estate parcels and commercial sites. Nineteen-foot-nine three-point line, twelve-foot lane, and enough length that a fast break means something.
Full court, professional
50' x 94'Rare on a residential lot and honest about why: it needs roughly a quarter acre once you add run-off and fencing.
Driveway or practice pad
20' x 30'Hoop, free-throw line, a workable key. The cheapest way into a real surface when the yard is spoken for.
Run-off deserves as much thought as the court. Two feet of apron past the baseline is the difference between stepping back onto concrete and chasing a loose ball into a cactus.


Turn a dead slab into a court your kids actually use
An abandoned tennis court, an RV pad, a patio extension nobody has sat on in years — if the concrete is structurally sound and sheds water, it is most of a basketball court already. We clean it, chase the cracks, foot a pole beside it and coat over the top.
A conversion runs a fraction of a fresh pour and finishes in days rather than weeks. The slab already sitting in your yard is nearly always the cheapest court you will ever own.
See What a Conversion CostsWhy Phoenix homeowners hire us to build their basketball courts
Laykold, applied by us
We hold the authorization to install Laykold and we do the surfacing ourselves rather than handing it down to a subcontractor. The crew that quotes your court is the crew that rolls it.
See our authorizationWe work to beat a comparable bid
Bring a written quote covering the same scope. We aim to land three percent under it wherever the numbers allow, without thinning the coating schedule or quietly downgrading the slab.
A deck you can still play on in July
Reflective pigment pulls real degrees off the surface temperature. On a black-top driveway hoop in August the game is over by ten in the morning. On this it isn't.
What a finished basketball court plays like
Grip through a cut
The sand load in the final coats decides how far a shoe slides on a crossover. We can run it slicker for a finesse game or grabbier for players who plant hard and change direction.
A bounce you can trust
A laser-flat slab and consistent coating thickness mean the ball returns the same height from the baseline corner as it does from the elbow. Inconsistent bounce is almost always a base problem, not a paint problem.
Evening basketball
Two LED poles convert a daytime basketball court into one that works after dinner — which in this climate is most of the usable year. We coordinate the electrical while the slab is still open.
Common questions about backyard basketball courts
- How much room do I need for a backyard basketball court?
- A playable half-court starts around 30 by 50 feet and gets comfortable at 35 by 60. A high-school full court needs 50 by 84 plus run-off. We measure your lot and show you the options at scale before you commit to anything.
- What size backboard should I get?
- Seventy-two inches is the regulation width and plays closest to a gym. Sixty inches suits a tighter half-court, and fifty-four is really a driveway size. Tempered glass gives the truest rebound; acrylic and polycarbonate cost less and handle hail better.
- Can you put a hoop on my existing driveway or patio slab?
- Often, yes. The questions are whether the concrete is thick enough to take a footing nearby, whether it drains, and whether the cracking is stable. If all three hold, surfacing and a footed pole turn it into a court without a new pour.
- How deep does the hoop footing need to go in Arizona soil?
- Deeper than most catalog instructions suggest. Expansive desert clay moves seasonally, so we size and depth the footing to hold a full-size backboard rigid through monsoon winds rather than to the minimum on the box.
- How hot does the playing surface actually get?
- Laykold's heat-reflective pigments measurably lower deck temperature against standard acrylic. It is still Arizona in July, but the gap is real and you feel it through your shoes during an afternoon game.
- How long does a basketball court take to build?
- A conversion over sound concrete is usually days. A new slab build runs longer because the pour has to cure properly before any coating goes down — rushing that step is how courts fail early.
Ready to put a hoop in your own backyard?
Start with the Instant Estimator for a preliminary range on your basketball court, then we come out and verify the site at no charge.
Price My Court